B
Borg Queen
All worlds
28 Mar 2013 21:39Link
One of my Corps in Unimatrix 01: Montford Air Transport has a contract for the Books and Newspapers it needs and that is running now for at least 34 months at 25000 units about 260 Quality, that makes a total of 900000 units. At the moment if has 677415 Units in stock with a quality of 159. How is it possible the quality is still at such a low level?
When I use the 677415 as 100% reference and consider it was at the start only at Q100, which was higher, and add those 25000 as 3,7% with Q260 then even it out by dividing it for 103,7% I get an increase at the start of about 5Q each month. As that change lowers with the difference between starting Q and finished Q I still come to a change of over 3Q per month with which I should at least be at total Q of 202 and thats with Q100 starting and only taking the last Q-Change which is the lowest
When I use the 677415 as 100% reference and consider it was at the start only at Q100, which was higher, and add those 25000 as 3,7% with Q260 then even it out by dividing it for 103,7% I get an increase at the start of about 5Q each month. As that change lowers with the difference between starting Q and finished Q I still come to a change of over 3Q per month with which I should at least be at total Q of 202 and thats with Q100 starting and only taking the last Q-Change which is the lowest